NOVA.
Loading studio
Start a brief
NOVA.Studio · since 2026Moscow → World
Booking · Q3 2026Currently 3 of 4 seats open18 sites shipped · 6 in flight

We build the one site you'll keep.

NOVA. is a studio in Moscow making the kind of site you build once and never apologise for. Slow, expensive, and on time. Premium showcases, considered commerce, and bespoke products for clients who can tell the difference.

§ 01 — Selected work

Currently
under NDA.

Real projects, real clients — just not public yet. Everything we're shipping right now is covered by an NDA.

◆ Portfolio under NDA

We'll post selected case studies here the moment a client clears us to. It won't be long.

Start a brief →
§ 03 — Process

Five stages.
No surprises.

Total elapsed time ranges from 8 to 16 weeks depending on scope. Every stage ships an artefact — there's no black box in this studio. The document you'd be reading at Stage 02 is the studio's design-system spec.

  1. 01 / Brief

    Two conversations, one document.

    An intro call, a working session, and a signed brief. We name the thing that's broken, the audience that matters, and the budget that exists — in plain sentences, no jargon.

    Brief PDF · 6ppStatement of workCalendar
    Week 1 · €0 — folded into total
  2. 02 / Concept

    Direction, before pixels.

    A 12–20 page document like the studio's design-system spec: naming, tokens, references, risks. The studio's bet on the brand before a single component is drawn. Signed off in writing.

    Concept docToken systemReference set
    Weeks 2–3
  3. 03 / Design

    Every screen, twice.

    Two rounds of high-fidelity design. Round one is the direction; round two is the resolution. We design in the browser when we can, in Figma when we must. Motion is prototyped, not described.

    Hi-fi screensMotion prototypeComponent map
    Weeks 3–7
  4. 04 / Build

    Next 15. Payload. Motion.

    Production build on the studio stack. Code review on every PR, a private staging URL from week one, performance budget enforced in CI. Same hands as design — there is no handoff.

    Staging URLCI · LighthouseCMS · seeded
    Weeks 6–14
  5. 05 / Ship

    Cutover, in daylight.

    DNS at 10:00 MSK, never on a Friday. Three weeks of post-launch support included. After that, the client owns the codebase and the studio is on a phone-call basis for as long as the site is live.

    DNS cutover3 weeks supportHandover
    Weeks 14–16
§ 05 — Begin

Have something unreasonable
in mind?

StudioMoscow · RU
CurrentlyBooking Q3 2026
Reply within36 hours
Minimum engagement$700